Our process explained

These are the steps we take, from the first point of contact right to the completion of the project, This gives you a general sense of the cost, the terms of payment, and the manufacturing and installation schedules.

Thoughtful young woman with wardrobe boxes and things near light wall.jpg

Following your initial phone conversation, email correspondence, or message, we will request the approximate measurements of your proposed new wardrobe or project. This enables us to give you a good representation of what your project is likely to cost. If you are at a loss for ideas at this stage, don't worry; we will create them along with you from our first meeting onwards.

We can provide you an estimated cost for your new wardrobe space as soon as we have your dimensions. We're confident that this will meet your needs and budget. If it does we'll set up a site visit so that we can measure everything precisely and go over all of your design options, including internal and external finishes.

Booking Deposit:

To start creating your new wardrobe's drawings, a little deposit is needed at this time; it will be subtracted from your total cost. After everything is finished, you will get a comprehensive specification sheet along with an elevation sketch of the interior and exterior finishes.

Main Deposit:

If you are happy with everything we have provided you we will now move onto the fabrication stage. We aim to build as much of your wardrobe off site in our workshop to minimise disruption at your home on day of install. A 40% payment is due prior to fabrication commencing.

Post Fabrication:

After we have finished fabrication of your new wardrobe we will contact you the day before we are due to install to take a further 30% payment.

Final Payment:

Installation day, leave this to us, its what we do best. We aim to only be at your home installing for 1-2 days but we will take care of everything whilst were there so you don't have to worry. All area's will be protected, dust extraction will be used, cleaned and all waste we have created will be removed ( we do NOT remove old wardrobes unless pre arranged at initial contact).

​

Final Payment to be made on day of completion whilst we are on site.